Turnham Primary School Hire Building Layout

Turnham School ask for extension to Hire building

In August 2015, Module-AR Limited delivered a full Turnkey solution to provide Turnham Primary School, Lewisham, with a temporary School building providing 5 No. Classrooms, a Hall, Office and WC’s for a period of 52 weeks. The building was installed whilst the main School is refurbished & extended at second floor level, to the south east end of the School to provide an Arts & Crafts room, together with the construction of a lift enclosure to second floor level, on the north east façade. The London Borough of Lewisham, commented that the advice, communication, facilitation, workforce, programme, value for money & overall performance were all of the highest standard and that they would recommend Module-AR again for similar work in the future. Due to the outstanding performance and quality of the Hire building, Turnham Primary School contacted Module-AR with regards to extending the original 1 year Hire period, as the main School building works continue to take place, and even wish to add a […]

Hounsdown School Double Classroom Extension

Double Classroom extension

Hounsdown School, Southampton, contacted Module-AR with a view to expanding their number of Classroom spaces on site in the form of a double Classroom extension to add to the modular Dance Studio that Module-AR designed & installed in 2014. The new building, designed by Michael Weakley Associates, will consist of 2 No. Classrooms, an Office, Entrance Hall and 2 No. WC’s. Grey UPVC double-glazed windows and a Merlin grey powder coated steel door with a keypad entrance lock will be fitted for improved security. Internally, the double Classroom extension will feature carpeted flooring for the Classrooms, Office & Store rooms with entrance matting for the Entrance Hall.  LED lighting, fire alarm & intruder alarm systems and heat & cool Air Conditioning complete the Module-AR structure. The modular Classroom will feature a 2.7m internal suspended ceiling height, UPVC Merlin Grey windows, a 15º pitched roof, Wedgewood Blue Plastisol wall panels & plinth and vertical cedar cladding to […]

Parish CoE School

Keys Handed Over To Parish CoE School

Client – London Borough of Bromley. Location – Parish CoE Primary School. Single Storey 12 No. Classroom Facility. Full Turnkey solution including removal of existing dilapidated buildings and installation of 8 No. temporary Classrooms. A recent Government study suggests that by 2023 there are expected to be more than 8 million pupils at school in England and the Local Government Association has predicted places will be needed for 880,000 extra pupils. Parish CoE School were an example of a School requiring extra teaching space and, thanks to Module-AR Limited, they have recently accommodated their brand new 12 No. Classroom with WC’s facility. A full Turnkey solution was provided including the removal of existing dilapidated buildings and the installation of 8 No. temporary classrooms whilst construction of the permanent school building took place. Words from the client Hilary Richardson, Headteacher at Parish CoE School, states: “Module-AR have provided Parish CoE School, Bromley, with […]

Turnham Primary School Classroom

Turnham Primary School Building Open For School Term

Client – London Borough of Lewisham. Location – Turnham Primary School. Single Storey 5 No. Classroom facility with Hall and WC’s. Temporary Building hired for 52 weeks. Turnham Primary School, in the London Borough of Lewisham, required a temporary school building to accommodate students whilst their existing school buildings are redeveloped. Module-AR Limited secured the project to provide 5 no. Classrooms with WC’s, a large 110m² open-plan Hall and Office for a period of 52 weeks. Our Off-Site cost-effective Construction methods were preferred to a traditional build due to the speed we can deliver high quality modular buildings to our clients. The Off-Site construction was delivered and installed in just 2 days, during the school holidays, ensuring little to no disruption to the school or the surrounding area. The on time and on budget full Turnkey solution was completed in 12 weeks which is up to 50% faster than a […]

Drumbeat SEN 6th Form College Building

Drumbeat Pupils move in to new ASD 6th Form Facility

Client – London Borough of Bromley. Location – Drumbeat School & ASD 6th Form College. Full Turnkey Solution. 2 Storey SEN 6th Form with Western Red Cedar Cladding. Classrooms, Group room, Independent Learning Space, IT rooms, Kitchen, Bathrooms and more. Students of Drumbeat School, Bromley, have recently accommodated their new bespoke 6th Form building provided by Module-AR Limited. The specialist ASD facility includes Classrooms, Bedrooms, a Kitchen, Independent Learning Space and more. Drumbeat School and ASD 6th Form required a full Turnkey package from a contractor to design, manufacture and install a 2 storey SEN (Specialist Educational Needs) Facility with an Independent Learning space for students with Autism Spectrum Disorder – which Module-AR Limited were awarded. The building is clad with Western Red Cedar to create a modern & stylish look. Aluminium & timber composite double-glazed windows were installed with brise soleil to provide innovative solar shading to all south facing elevations. An internal roof […]

Kidbrooke Skills Centre

Kidbrooke Skills Centre Opens For Community

Client – Royal Borough of Greenwich. Location – Kidbrooke. 5th Local Skills Centre.  Classrooms, Kitchen, Administration Office, Lobby & WC’s. As part of an initiative by the Royal Borough of Greenwich Council to provide new opportunities for residents to access training & work in sectors with excellent job prospects, Module-AR Limited won a contract to provide the fifth local skills centre in Kidbrooke, Greenwich. The recently completed skills centre delivers specific courses in construction – from theory based training to short courses in a large range of subjects. For example: Asbestos awareness Kerb laying Drain laying Traffic marshalling Manual handling The building consisted of two Classrooms over 60m², a Kitchen/Break Out area, an Administration office, Lobby and WC’s. A superior than standard 5kN/m² floor loading, suspended ceilings, air conditioning, interactive whiteboards, shelving units, hat & coat hooks and pin boards were also fitted to ensure the interior was robust enough for the construction […]

Prince of Wales Primary School Classroom

Prince of Wales School Modular Extensions

Client – London Borough of Enfield. Location – Prince of Wales Primary School. Full Turnkey solution. 2 No. buildings – both of which are extensions to existing buildings. 3 No. modular Classroom Facility and a 4 No. Module Hall. Module-AR Limited are pleased to announce that the Prince of Wales School modular extensions are open for the new school term. Prince of Wales School opened in 1950 and is situated in Enfield Lock, North East of the London Borough of Enfield. It is a larger than average 3 Form of Entry Primary School that benefits from extensive grounds. These include gardens, a pond, sports fields, playgrounds and environmental areas. Due to the growing need for additional space in the Education sector, Prince of Wales required an expansion to their existing facilities to accommodate extra pupils. Module-AR Limited secured the contract to design, manufacture and install 2 No. buildings – both […]

Thomson House Free School Building

Thomson House Free School 2 Storey Extension

Client – London Borough of Richmond. Location – Thomson House Free School. 2 Storey 6 No. Classroom Building. Brickslip & Render Cladding with Curtain Wall Window System to Western Elevation. The 2 storey off-site Module-AR Limited construction is open for the new School term at Thomson House Free School. Thomson House Free School, Richmond, required additional teaching facilities to accommodate for the growing need for space in the education sector.  Module-AR Limited were awarded the contract to provide a full Turnkey solution including the design, supply & manufacture of an 18 bay, 2 storey modular classroom accommodation and associated foundations. The 6 No. Classroom building is externally clad in a combination of Brickslip and Render to match the existing nearby buildings. Additionally, a curtain wall window system was fitted to the Western elevation creating a naturally bright and light interior. A Roof Mansafe system with access hatch & ladder for access from […]