Network Rail – Stockport

  • Client – Network Rail
  • Project size – 2,186m²
  • Completion – 14 weeks
  • 2 Storey Office & Welfare Facility
  • Part Cedar & Part Kingspan External Cladding

Module-AR Limited were granted the project to design a 2,186m², two storey, 64 No. module Office and Welfare facility for Network Rail. This facility to accommodate 132 Office staff with Welfare facilities for 240 staff at their Stockport branch.

This purchase building was finished externally with Plastisol (plastic coated steel). This was bonded to 9mm WBP exterior grade plywood. The plywood panel was fitted to a timber frame to form a stressed skin construction. The part Cedar and part Kingspan cladding chosen by Network Rail creates a modern & aesthetically pleasing structure.

The external windows of the building are thermally broken PC Aluminium frames incorporating laminated & toughened glass, fitted with Trickle Vents to provide background ventilation. All windows can be opened and cleaned from the inside of the building, reducing the risk of falls from ladders as associated with external cleaning methods. The external doors of the building are manufactured from double skinned 1.2mm Zintec steel with interlocking seams and reinforced interlocking channels & tubes to prevent twisting.

The interior of the Network Rail Stockport building was designed to meet Network Rail corporate DNA and has produced a creative and productive environment that is a pleasure to work in. On the ground floor of the fully Heat & Cool air conditioned building is a Briefing room, Meeting room, Archive room with an enhanced 5kN/m² floor loading, four No. Offices, a large 216m² Refectory (with dishwashers, sinks, fridges & seating accommodation), a Store room, Switch room, male & female WC’s and shower facilities, a 135m² Drying room, a 135m² Locker room, a Lobby with Reception area and a Security room. two No. corridors with stairwells and a DDA Compliant lift were installed to take employees to the first floor of the structure. The first floor features a huge 665m² open plan Office, five No. additional Meeting rooms, a Communications room, open plan fully-fitted Kitchen/Dining area, Casual Meeting space and male & females WC’s.

In total the project was designed, manufactured and installed in just 14 weeks with dramatically reduced on site traffic and site disruption. This was extremely important to Network Rail as the building is situated next to a live railway.