Biffa Waste Services – Trafford Park

  • Client – Biffa Waste Services Ltd.
  • Project size – 36m²
  • Completion – 5 weeks
  • Modular Weighbridge Office
  • Office, Kitchen space and WC

Biffa Waste Services Ltd is the leading nationwide integrated waste management business providing collection, treatment, recycling and technologically-driven energy generation services. The Trafford Park branch required a modular weighbridge office solution which Module-AR Limited were awarded the contract.

The steel framed structure was constructed with Plastisol (plastic coated steel) external walls, canopy and fascia to ensure that the building is secure, long-lasting & maintenance free. A steel external door and double-glazed UPVC windows were also fitted to improve security and to ensure the building had the feel of a traditionally built structure..

Internally the building features non-slip Polyflor Polysafe vinyl floor and is designed with an open plan area featuring an Office for 2 members of staff, Kitchen space with sink, base units and refrigerator and a disabled WC. Fluorescent lighting, Heat & Cool air conditioning, standalone fire alarm and intruder alarm systems were also installed.

The full project was designed, manufactured & fitted in 5 weeks and just 1 day was needed to fully install the module. This is up to 50% faster than if the project was completed traditionally.