Biffa Waste Services – Thurrock

  • Client – Biffa Waste Services Ltd.
  • Project size – 45m²
  • Completion – 4 weeks
  • Office & Welfare Facilities
  • Office, Lobby, Kitchen, Showers and WC’s

Biffa Waste Services Ltd is the leading nationwide integrated waste management business providing collection, treatment, recycling and technologically-driven energy generation services. Their Thurrock branch required an additional office & welfare accommodation, which Module-AR Limited won the contract to provide.

Externally, the module features an entrance ramp & steps and is clad with Plastisol (plastic coated steel) external walls & fascia. UPVC top third TOV lockable windows with restrictors, manually operated roller blinds and external wire mesh window guards were also installed ensuring a robust and highly secure finish.

The jackleg cabin consists of a Kitchen (installed with base units, wall units, 4 No. drawer cupboard, fridge and worktop), Showers, Changing rooms, a 2 person Office, Lobby and WC’s.

Polysafe standard vinyl flooring was installed in the Kitchen, WC’s, Showers and Changing rooms. Primavera Xtra carpet tiles were chosen as the flooring for the Office and Lobby. Both of these flooring options are extremely robust and hard-wearing for a maintenance-free solution. Heat & Cool air conditioning and vertical cream internal blinds were also fitted.

Just 1 day was required for Module-AR Limited to deliver and install the module on the Thurrock site, greatly reducing site traffic and disturbance compared with traditional construction methods, and a total of 4 weeks was required to complete the project for Biffa Waste.