Biffa Waste Services – Somerset

  • Client – Biffa Waste Services Ltd.
  • Project size – 150m²
  • Modules – 4
  • Factory build – 3 weeks
  • Installation – 1 day
  • Completion – 8 weeks

Biffa is the leading nationwide integrated waste management business providing collection, treatment, recycling and technologically-driven energy generation services. The Somerset branch of Biffa required a building to be used as Office Accommodation and Site Welfare. Module-AR Limited were granted the contract and 4 No. AR3000 units were designed, manufactured and installed to complete the single storey building.

The full Turnkey package was provided by Module-AR Limited for this project including laying the foundations and installing mains services for the building. Externally the office features Plastisol (plastic coated steel) walls, fascia and plinths for a long-lasting, secure and maintenance free exterior. Steel columns & doors with multi-point locking, double glazed UPVC lockable windows with restrictors and steps, ramps & associated handrails finish the outside of the building.

Internally, the Office & Welfare facility opens into a Lobby & Traffic Office room which joins on to the Archive/PPE store, Depot Manager room, Drivers’ Mess room, Kitchen, Locker room and WC’s. A combination of Polysafe standard vinyl and carpet tiled flooring were fitted for a hard wearing finish.

Additional extras such as CCTV, a lightning protection system, standalone fire alarm & intruder alarm systems, fluorescent lighting, internal vertical blinds and Heat & Cool air conditioning were also installed as part of the Turnkey solution.

The installation of the 4 No. modules was completed in just 1 day, greatly minimising site traffic & disturbance to the busy facility. The full Biffa Waste Services Somerset project was completed in just 8 weeks.